![](http://imagev2.xmcdn.com/group53/M07/8E/3C/wKgLcVwBQbTR379dAARO6IVGEoc486.jpg!strip=1&quality=7&magick=jpg&op_type=5&upload_type=cover&name=web_large&device_type=ios)
声音简介
After this order is given from bridge, the following work should be done one by one: Check main engine telegraph and ship’s clock Test the steering gear operation Start another generator and put in use Start all necessary pumps Put on turning gear and let it run about half hour Drain water from air receiver 驾驶台发出指令后,做以下的工作 检查主机车钟和船上的表 测试舵机的运行 启动另一个发电机并投入使用 启动所有必要的泵 啮合盘车机并使其运行约半小时 泄放空气瓶的水
音频列表
- 2018-11
- 2018-11
- 2018-11
- 2018-11
- 2018-11
- 2018-11
- 2018-11
- 2018-11
- 2018-11
- 2018-11
查看更多
用户评论