PUT THE OPTICAL FIXTURE INTO FOCUS.
FOLD THE MATERIAL.
THE DRAG-STAY ASSEMBLY FOLDS WHEN THE NLG RETRACTS.
FOLD THE ROTOR BLADES.
THIS TEST FOLLOWS THE INSTALLATION OF THE HP PUMP.
DO THE PROCEDURE THAT FOLLOWS.
WHEN YOU USE THIS MATERIAL, OBEY THE MANUFACTURER'S INSTRUCTIONS.
MAKE SURE THAT THESE CIRCUIT BREAKERS ARE CLOSED.
OBEY THE PRECAUTIONS THAT FOLLOW.
LET THE POTTING COMPOUND DRY FOR ONE HOUR.
OBEY THE REMOVAL PROCEDURES FOR THE COMPONENTS.
IT IS NOT PERMITTED TO INSTALL MORE THAN TWO WASHERS FOR EACH BOLT.
用户评论