Article 280Where losses are caused to a contract-offering party due to the fact that the prospecting or designing does not conform to the quality requirements or that the prospecting or designing documents are not submitted as scheduled, thus delaying the period for construction, the prospecting or designing party shall go on perfecting the prospecting or designing, reduce or waive the prospecting or designing fees and make compensation for the losses.
Article 281If the quality of a construction project fails to meet the contracted requirements due to reasons attributable to the construction party, the contract-offering party has the right to demand the repair, reworking or reconstruction free of charge by the construction party within a reasonable period of time. If delivery is delayed because of the repair or reworking and reconstruction, the construction party shall bear the liability for breach of contract.
Article 282If a construction project causes personal injury and property losses due to reasons attributable to the contractor within a reasonable period of use of the project, the contractor shall hold the liability for losses.
核心词汇和搭配:
submitted as scheduled 按期限提交
delaying the period for construction 拖延工期
go on perfecting 继续完善
waive 放弃
construction party 施工人
reworking 返工
reconstruction 改建
causes personal injury and property losses 造成人身和财产损害
条文对照讲解:
第二百八十条 勘察、设计的质量不符合要求或者未按照期限提交勘察、设计文件拖延工期,造成发包人损失的,勘察人、设计人应当继续完善勘察、设计,减收或者免收勘察、设计费并赔偿损失。
第二百八十一条 因施工人的原因致使建设工程质量不符合约定的,发包人有权要求施工人在合理期限内无偿修理或者返工、改建。经过修理或者返工、改建后,造成逾期交付的,施工人应当承担违约责任。
第二百八十二条 因承包人的原因致使建设工程在合理使用期限内造成人身和财产损害的,承包人应当承担损害赔偿责任。
附注:中文条文选自《中华人民共和国合同法》(现行有效),英文条文选自全国人大法规库版本。
每周一至周五更新,欢迎朋友们给罗律师留言,探讨交流。
更多内容请查看微信公众号:迦南法颂。