Article 256 If the client is to provide materials, it shall provide materials as contracted. The contractor shall promptly inspect the materials provided by the client, and, if any unconformity with the agreement is found, the contractor shall promptly tell the client to make replacement, make up the shortage or take other remedial measures.
The contractor may not, without consent, change materials provided by the client nor change accessories and parts requiring no repair.
核心词汇和搭配:
client 定作人
promptly 及时
inspect 检验
unconformity with the agreement 不符合约定
make replacement 更换
make up the shortage 补齐
take other remedial measures 采取其他补救措施
change accessories and parts requiring no repair 更换不需要修理的零部件
条文对照讲解:
第二百五十六条 定作人提供材料的,定作人应当按照约定提供材料。承揽人对定作人提供的材料,应当及时检验,发现不符合约定时,应当及时通知定作人更换、补齐或者采取其他补救措施。
承揽人不得擅自更换定作人提供的材料,不得更换不需要修理的零部件。
附注:中文条文选自《中华人民共和国合同法》(现行有效),英文条文选自全国人大法规库版本。
每周一至周五更新,欢迎朋友们给罗律师留言,探讨交流。
更多内容请查看微信公众号:迦南法颂。
用户评论